2013-2015
Mastec Network Solutions,
Centennial, CO
Construction Manager/ AT&T Wireless
Project
·
Managed
all electrical construction projects. Projects included new site builds,
equipment upgrades, site modifications for LTE/Fiber optic upgrades, and
decommissioning of sites.
·
Worked
directly with the subcontractors to insure NEC, local electrical standards,
and AT&T site specific specifications were followed.
·
Conducted
preconstruction, daily, final, and turn over inspections on all sites to
insure work was completed in a timely matter meeting specific project
deadlines.
·
Daily
inspections also insured that quality accurate work was being produced and
that the crews were working in a safe environment by following OSHA and
AT&T safety standards.
·
If
the subcontractors had any issues on site with material or construction
questions, I was readily available at any time of day to resolve matters.
·
Supported
other site Construction Managers to help complete their sites, and meet
their construction deadlines.
·
Coordinated
all work requests from project managers. Identified scope of work and
deployed and managed in-house crews and subcontractors to insure work was
complete in a timely manner to meet project commitment dates.
·
Processed
site BOMs, OOMs, and invoices to insure accurate financial accountability
was captured per site.
·
Generated
and maintained a daily tracker and crew log for all electrical work.
·
Created,
submitted, and tracked site MOPs.
2012- 2013
Xcellent Technology Solutions-
Sacramento, CA
Foreman Electrician-
·
Managed all electrical crews. Conducted safety meetings
and training.
·
Responsible for all electrical work to include new site
builds, -48V Infinity Power Plants installation and +24V Power Plant
decommissioning, battery stack decommissioning and installation, LTE, 1C,
2C, 3C, 4C, and 5C technologies.
·
Material ordering, receiving and control.
·
Conducted skilled journey-level electrical work
involving installation, modification, troubleshooting, inspection, repair,
and decommissioning of wireless telecommunication type electrical systems.
·
Installed meter bases, disconnect switches, service
panels and sub-panels, DC power plants, electrical equipment requiring AC
or DC power, cut and assemble conduit(rigid and pvc), fabrication of
conduit support brackets and H-frames, battery stacks, ground rods, ground
rings, and pull and terminate wires for AC and DC main feeder and branch
circuits
· Installed
Infinity Power Plants, BBUs(battery back up systems), RBA 72 and Purcell
enclosures, LTE equipment to include but not limited to Raycaps, DC12s, and
Squids for surge protection, RRUs for 1C, 2C, 3C, 4C, and 5C technologies,
SIADs, and 6601/DUWs. Installations included wiring for power, alarms
and grounding.
2011-2012
X3 Management- Sacramento, CA
Lead Electrician-
·
Conducted skilled journey-level electrical work
involving installation, modification, troubleshooting, inspection, repair,
and decommissioning of wireless telecommunication type electrical systems.
·
Assisted Electricians wit h the installation of meter
bases, disconnect switches, service panels and sub-panels, DC power plants,
electrical equipment requiring AC or DC power, cutting and assembling of
conduit(rigid and pvc), fabrication of conduit support brackets, battery
stacks, ground rods, ground rings, and pulled and terminated wires for AC
and DC main feeder and branch circuits
· Installed
Infinity Power Plants, BBUs(battery back up systems), RBA 72 and Purcell
enclosures, LTE equipment to include but not limited to Raycaps, DC12s, and
Squids for surge protection, RRUs for 1C, 2C, 3C, 4C, and 5C technologies,
SIADs, and 6601/DUWs. Installations included wiring for power, alarms
and grounding.
2010- Present
Wireless Network Group- Pompton Plains,
NJ
Electrician-
·
Maintenance electrician
for AT&T wireless sites
·
Repair, maintain, install,
and troubleshoot AC and DC power and Telco for sites and equipment.
·
Deploy generators- hook up
via Appleton plugs or hard wire directly to service disconnect or main
electrical panel
·
Install and maintain
various types of battery stacks
·
Repair and replace stolen
or damaged ground wires and ground busses insuring sites are properly
protected from lightning strikes or power surges.
·
Repair, maintain, install
and troubleshoot various site equipment to include power plants,
rectifiers, UMTS cabinets, and GSM/BTS cabinets
·
Perform preventative
maintenance on site equipment to include replacing and cleaning HVAC units.
2008-2010
Becon Construction/Bechtel
Corporation- Columbia, MD
Wireless Technician/Electricians
Helper-
·
Conducted skilled
journey-level electrical work involving installation, modification,
troubleshooting, inspection, repair, and decommissioning of wireless
telecommunication type electrical systems.
·
Assisted Electricians with
the installation of meter bases, disconnect switches, service panels and
sub-panels, DC power plants, electrical equipment requiring AC or DC power,
cutting and assembling of conduit(rigid and pvc), fabrication of conduit
support brackets, battery stacks, ground rods, ground rings, and pulled and
terminated wires for AC and DC main feeder and branch circuits.
·
Installed GSM/BTS and UMTS
Node B cabinets manufactured by Lucent, Nokia, or Ericsson.(2106, 2206,and
3206) Installations included setting and anchoring cabinets, grounding
cabinets and components, plumbing RF coax cables, installing and
terminating AC or DC power, and punching down CAT 5 needed for alarms.
·
Programmed and tuned
various components with laptop.
·
Assisted tower crews with
the installation of RF jumpers, connectors, diplexers, and with performing
line and full systems sweeps.
·
Performed Telco
installation, maintaining, troubleshooting, relocating, and decommissioning
of equipment, devices, and conduit required to expand or deliver new T-1
service. New installations included Verizon Mesa cabinets, Hoffman boxes
for new telco boards, 66 blocks, voltage surge arrestors, pulled and
terminated 25 pair and CAT5. Expansion installations included pulling and
terminating of additional 25 pair and CAT5 for future alarms and expansion.
All installations included grounding of 25 pair, CAT5, equipment and
devices.
·
E-911: Installed
LMUs and GPS antennas for new and existing sites. Provided DC power for equipment
from existing DC power supply or by installing AC/DC converters. Connected
CAT5 and cables from GSM/BTS equipment to LMU. Conducted E-911 call testing
whenever sites were brought down for maintenance, upgrades, or when new
sites were brought on air for first time.
·
Completed all
required site data documentation forms, redline drawings, and photographs
needed for site turn over packages.
·
Helped civil crews
construct ice bridges, form and set concrete pads, trench for
electrical/telco conduit and hand holes, and also assisted with site
restoration.
|